🏠 Single house
Wall-box 7.4 kW or 11 kW: €800-2,500 installation included. No authorisation needed if you are the owner. FR tax credit of €500 on installation in 2026.
Everything you need to know to charge your electric car in 2026: how much it costs by country and charging mode, which station to install at home, which card to choose for trips, which incentives to claim. Data verified and updated monthly by our Simulator Agent.
Reference residential rates (peak hours / average rate). A full 60 kWh charge (~350 km range) costs on average €16 in Europe. On public fast charging (DC), expect 2 to 3 times more.
| Criterion | Home (AC) | Public slow (AC) | Public fast (DC) |
|---|---|---|---|
| Average price | €0.18-0.25/kWh | €0.30-0.45/kWh | €0.45-0.65/kWh |
| Power | 2-22 kW | 3-22 kW | 50-350 kW |
| Time (60 kWh) | 3-12 h | 3-8 h | 20-45 min |
| Ideal use | Daily, night | Work, parking | Long trip, holidays |
| Initial investment | €800-2,500 (station) | None | None |
Rule of thumb: 80% of your charging should happen at home (or work). Public fast stations are 2-3x more expensive and accelerate battery wear; reserve them for long trips.
In Europe, over 25 charging cards share the market: IONITY Motion, Chargemap, Plugsurfing, Shell Recharge, Izivia, Electra, Fastned, etc. Our comparators detail the prices by country for each.
On the main European routes, the density of fast DC stations is now sufficient for any holiday trip. Our trip pages automatically calculate the number of stops needed based on your vehicle's range (270 km real motorway average).
Wall-box 7.4 kW or 11 kW: €800-2,500 installation included. No authorisation needed if you are the owner. FR tax credit of €500 on installation in 2026.
Right-to-plug: any co-owner can have a station installed on their space. The building cannot oppose it (LOM law in France). Advenir bonus up to €960.
→ Complete guide to charging in apartment buildings40% accelerated depreciation in France for on-site stations (until end 2026). Advenir B2B bonus up to €2,100 per public-accessible charging point.
Four other complete dossiers to go further on the car in 2026.